How to Build an Approval Matrix for Creative Review

A step-by-step guide to an approval matrix for creative review: deliverables, roles, stages, status and deadlines in one table.

Alex, CTO
How to Build an Approval Matrix for Creative Review

To build an approval matrix for creative review, list every deliverable that needs sign-off, name who creates, reviews and approves each one, set the approval stages, and keep it all in one table with a status and a deadline per row. This guide walks through those steps and shows where a table on an Enterall board fits.

What is an approval matrix for creative review?

An approval matrix for creative review is a table that shows who reviews and who signs off on each deliverable in a creative project, and at which stage. It gives every piece of work one named decision owner.

  • Rows are deliverables, such as design drafts, campaign materials or product concepts.
  • Columns are roles, stages, status and deadline.
  • One person per deliverable has the final say, so feedback does not stall.

Creative projects often involve content creators, project leads and clients. Without a shared reference, it is easy to miss who has approved what.

How do you structure an approval matrix?

Structure an approval matrix as a table with one row per deliverable and one column each for the creator, the reviewer, the approver, the current status and the deadline.

  • List all deliverables in the first column.
  • Add a column per role: creator, reviewer, approver.
  • Add a status column with a few fixed values, for example pending, approved and rejected.
  • Add a deadline column for each approval stage.
  • Keep the table to what people actually need to act on.

Simplicity matters. A matrix with too many columns is rarely kept up to date, and then it stops being the single reference it was meant to be.

Who should be included in an approval matrix?

Include everyone who creates, reviews or approves the work, plus whoever oversees the timeline. Each person should have one clear role per deliverable.

  • Creators produce the deliverable.
  • Reviewers give feedback and suggest changes.
  • Approvers have the final say.
  • Project leads watch the timeline and the process.

Tip: tell everyone their role before the first review round starts, so nobody finds out at sign-off that they were the approver.

What are the steps to build an approval matrix?

Build the matrix in five steps: identify deliverables, define roles, set stages, organize the table and schedule updates.

1. Identify the deliverables that need approval

List every piece of work that needs formal sign-off, for example design drafts, campaign materials or product concepts. Describe each one clearly so reviewers know exactly what they are approving.

2. Define roles for each deliverable

Assign a creator, a reviewer and an approver per deliverable, based on expertise. Keep one approver per deliverable.

3. Set the approval stages

Split the process into stages such as initial review, revisions and final sign-off, so feedback is handled at each stage.

4. Organize everything in one table

Put deliverables in rows and roles, stage, status and deadline in columns. Add a comments column for context behind a decision.

5. Review and update the matrix

Revisit the matrix when team members change, when a deliverable is added or when the scope shifts. Adjust roles or stages to match.

What mistakes should you avoid in an approval matrix?

The most common mistakes are too many approval layers, unclear roles, missing deadlines and a matrix nobody updates.

  • Too many layers slow decisions down. Keep the number of approvers per deliverable small.
  • Unclear roles lead to duplicated work or missed approvals. Name one person per role.
  • Without deadlines, approvals can drag on. Set a date for each stage.
  • Vague wording invites misreading. Use short, exact labels for statuses and stages.

How do you keep the matrix clear and easy to scan?

Use consistent labels and a small set of statuses, so the table can be read at a glance.

  • Use the same wording for statuses in every row.
  • Keep one deliverable per row and one decision owner per row.
  • Add a comments column for context that should not get lost.
  • Sort or filter by status or deadline to see what is waiting.

Color coding can help too, for example green for approved, yellow for in review and red for rejected, as long as the labels are written out as well.

How often should an approval matrix be updated?

Update the matrix whenever roles, scope or deliverables change, and at least at each major project milestone. A matrix that is out of date is worse than none, because people trust it.

  • When a team member joins or changes role.
  • When a new deliverable is added or one is dropped.
  • After each approval is granted or rejected, so the status stays true.
  • At key milestones, when you also check whether the stages still fit.

Tell the people involved when the matrix changes. If approvals are often late, the matrix may need clearer deadlines or fewer stages.

How can you build an approval matrix in Enterall?

In Enterall, a collaborative visual workspace, you can build the matrix as a rich table next to the references it refers to. Approval matrices are one of the uses Enterall's rich tables are made for, next to deliverable trackers and shot lists.

  • Rich tables have typed columns, sorting and filtering, so you can sort by status or deadline.
  • The table sits on the same board as the images, so reviewers see the work and the decision together.
  • Collaborators can comment on the relevant material, and a mention notifies the person you are asking.
  • Version history keeps earlier saved states that can be reviewed or restored.
  • Calendars can hold review milestones next to the table.

A spreadsheet works for a small team, but it keeps the matrix away from the images being reviewed. On an Enterall board the two stay together.

FAQ

What is the purpose of an approval matrix?

It shows who reviews and who approves each deliverable in a creative project, so decisions have a clear owner and nothing is missed.

How do you decide who should approve what?

Base it on expertise and responsibility. Creators produce, reviewers give feedback and one approver per deliverable makes the final decision.

Can an approval matrix be used for several projects?

Yes. Reuse the structure, but adapt the deliverables, roles and stages to each project.

What is the difference between a reviewer and an approver?

A reviewer gives feedback and suggests changes. An approver gives the final sign-off.

How do you handle disagreements in the review?

Go back to the matrix: the named approver decides. Involving the project lead can help when reviewers disagree.

What format works for an approval matrix?

A table. It shows deliverables, roles, statuses and deadlines in one view. A rich table on a board or a spreadsheet both work.